Geelong Circuit: Cement Works Path, River, Waterfront: Sunday, February 23rd, 2014

David and Nancy led 9 cyclists for this morning’s ride from Rippleside Park – Tricia and Shane, Rosemary, Stella, Arthur, Peter and Helen.  David warned of steep sections with low gears needed.  Everyone heeded his advice.

The old Cement Works Railway Trail is Geelong’s oldest rail trail – but still one of the best.

After a sweep down Highland Street (watch for a rough surface near the top), it was onto the Barwon Trail – the left bank path.

Coffee was at Little Creatures.  It’s quirky and the coffee’s great.

The ride returned to Rippleside via Swanson Street and the waterfront.

Thanks to David and Nancy for a most enjoyable morning’s ride.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s